Tag: T4A
-

Provide additional information on “Non-Low-Floor Buses” to the Consumer Transportation Committee
June 19, 2023 We have been discussing the issue of “Non-Low-Floor Buses” for about a year now. Today, we had a meeting with the…
-

NLA and the Disabilities Networks visited the Chiang Rai railway station on the Double-track Rail Line project of the Den Chai – Chiang Rai – Chiang Khong route
February 23, 2023 As representatives of T4A, we had the opportunity to join the Social and Enterprise Development Commission for Children, Youth, Women, the…
-

The Role and Collaboration of the Public and Private Sectors in Promoting Inclusive Smart Cities
To promote the implementation of the ASEAN Enabling Masterplan 2025, I had the opportunity to speak before the closing of the seminar with the…
-

Joint Test of Electric-Boat Service on Khlong Phadung Krung Kasem – Excellent!!
23 November 2020 I have been invited by the Traffic and Transportation Department, Bangkok Metropolitan Administration(BMA) to join their test of an electric-boat service…
-

Latest news: Bua Yai Junction railway station, Nakhon Ratchasima
According to the image, I have just received the latest news from our associate group. I am glad that “at least” we have some…
-

The 2nd meeting of metro train accessibility verification for Pink Line (Khae Rai – Min Buri) and Yellow Line (Lat Phrao – Samrong)
19 March 2020, we joined a meeting regarding the metro accessibility verification of those ‘under-construction’ train lines in Bangkok by checking the blueprints and…
-

T4A’s train station accessibility at Bangkok Purple Line MRT, Nonthaburi 1 Station with the Ministry of Transport’ advisor.
MRT Purple Line is one of the problematic metro train systems and ‘Station access level quite low’ because the station size is very large…
-

Joining a meeting with the Traffic and Transportation Department (TTD) about BTS elevators project and Change Bangkok for everyone campaign
On behalf of the president of a railway accessibility and a following-up of BTS elevators installation group, the representative of T4A association and PWDs,…
-

Meeting: Physical Conditions and Connectivity of the New MRT stations
After we have conducted field survey at the stations so many times, today I and Mr. Ood, on behalf of Transportation For All (T4A),…
-

The power of change, an impressive progress from Korat super cool!!
Thailand’s public transportations is currently flourishing throughout the country, not just Bangkok. More than 5 years I and our strong networks have engaged in…

